Trade Wizard features powerful TradingView charts to bring you the latest Bursa Malaysia stock pricing and market data. Sharpen your analysis with the TradingView platform — track market trends, follow global benchmarks like dow jones futures, and use robust tools to interpret price movements — all in one place.
Revenue for the financial year ended 31 March 2026 rose 142.7% to RM151.49 million from RM62.41 million in FYE 2025, driven by commencement of the Sedenak commercial project in Johor, higher M&E activities in the Valdor Industrial Park and Bandar Sri Iskandar industrial projects, and higher activity in the Kulim interconnection facilities project[1].
Gross margin declined from 34.9% to 23.6%
Gross profit margin for the quarter ended 30 June 2026 fell to 23.6% from 34.9% in the prior quarter ended 31 March 2026, while the full-year FYE 2026 margin of 23.8% was lower than FYE 2025's 24.4%, which management attributes to completion or near-completion of higher-margin projects and dilution from certain major ongoing projects with lower margins[1][2].
Order book grew to RM206.4 million
The outstanding order book increased to RM206.4 million as at 30 June 2026 from RM151.9 million as at 31 March 2026, providing near-term revenue visibility, while the company had 45 pending tenders totalling RM879.41 million awaiting decision as at 31 March 2026[1][2].
IPO raised RM25.32 million gross proceeds
Kee Ming Group successfully listed on the ACE Market of Bursa Malaysia on 12 February 2026, raising total gross proceeds of RM25.32 million earmarked primarily for project working capital (51.3%), performance bonds (15.8%), and expansion of the project team (6.8%)[1].
Kee Ming Group is an M&E engineering solutions provider in Malaysia offering electrical engineering (HV, MV, LV, ELV installations) and mechanical engineering services (ACMV, fire protection systems) for residential, commercial, industrial, clean energy, public infrastructure and interconnection facilities, plus maintenance and repair services.
Read the full answer
Kee Ming Group Berhad provides mechanical and electrical (M&E) engineering services in Malaysia, spanning electrical engineering services such as high-voltage (HV), medium-voltage (MV), low-voltage (LV) and extra-low-voltage (ELV) electrical installations, as well as mechanical engineering services including air-conditioning and mechanical ventilation (ACMV) and fire protection systems[1]. The company's services cover residential, commercial and industrial developments, clean energy projects, public infrastructure and interconnection facilities[1]. Kee Ming operates either as a main contractor or subcontractor depending on project scope and customer requirements[1].
As a registered G7 contractor and SPKK G7 licence holder with the Construction Industry Development Board (CIDB), the company is qualified to tender for M&E engineering projects of unlimited value in both the private and public sectors[1]. Kee Ming is also registered as an Electrical Contractor of Class A with the Energy Commission, allowing it to perform electrical work of above RM1.00 million in value, and is a registered solar photovoltaic service provider with the Sustainable Energy Development Authority[1]. Complementing its core engineering services, the company provides maintenance and repair services for M&E equipment and systems[1].
How does Kee Ming make money?
Kee Ming Group generates revenue from two segments: M&E engineering services (99.9% of revenue in both FYE 2025 and FYE 2026) providing design, project management, supply, installation, testing and commissioning; and maintenance and repair services (0.1%). Industrial and commercial sectors collectively contributed 81.0% of total revenue in FYE 2026.
Read the full answer
Kee Ming Group makes money through two business segments: M&E engineering services and maintenance and repair services[1]. M&E engineering services accounted for 99.9% of total revenue in both the financial year ended 31 March 2025 and the financial year ended 31 March 2026[1]. This segment includes design and build, project management, supply, installation, testing and commissioning of M&E engineering solutions[1]
Which business segments performed better or worse for Kee Ming?
M&E engineering services revenue rose 142.7% from RM62.35 million in FYE 2025 to RM151.34 million in FYE 2026, driven by commencement of Sedenak Project in Johor, higher activity in Valdor Industrial Park and Bandar Sri Iskandar industrial projects, and higher activity in Kulim interconnection facilities project. Maintenance and repair services revenue remained minimal at 0.1% in both years.
Read the full answer
M&E engineering services, which contributed 99.9% of Kee Ming Group's revenue in both FYE 2025 and FYE 2026, experienced strong growth during the financial year ended 31 March 2026[1]. Revenue from this segment increased by RM88.99 million or 142.7%, from RM62.35 million in FYE 2025 to RM151.34 million in FYE 2026[1]. Management attributes this increase to three main factors: commencement of a new commercial project in Johor (the Sedenak Project); higher levels of M&E activities in two industrial projects, namely the Valdor Industrial Park Project and the Bandar Sri Iskandar Project; and higher levels of M&E activities in an interconnection facilities project, the Kulim Project
What were Kee Ming's latest quarterly results?
For the quarter ended 30 June 2026, Kee Ming Group reported revenue RM48.4 million (up 15.6% quarter-over-quarter), profit before tax RM8.9 million (down 2.7% QoQ), net profit RM6.4 million (up 6.1% QoQ), and basic EPS 1.98 sen. Total assets stood at RM131.3 million and total equity at RM67.8 million.
Read the full answer
For the quarter ended 30 June 2026, Kee Ming Group reported revenue of RM48.4 million, an increase of 15.6% from RM41.9 million in the immediately preceding quarter ended 31 March 2026[1]. Profit before tax was RM8.9 million, a decrease of 2.7% from RM9.1 million in the prior quarter[1]. Net profit after tax was RM6.4 million, up 6.1% from RM6.1 million quarter-over-quarter[1]
Who owns Kee Ming?
As at 1 July 2026, Ir. Liew Kar Hoe held 50.65% through 164,612,530 shares, and Solarvest Holdings Berhad held 23.85% through 77,512,470 shares. These are the two substantial shareholders listed in the register of substantial shareholders.
Read the full answer
As at 1 July 2026, the largest shareholder of Kee Ming Group Berhad was Ir. Liew Kar Hoe, who held 164,612,530 shares representing 50.65% of the company[1]. The second-largest holder was Solarvest Holdings Berhad, with 77,512,470 shares representing 23.85%[1]. These two are the substantial shareholders (those holding 5% or more) listed in the register of substantial shareholders[1].
The register of substantial shareholders shows Ir. Liew Kar Hoe with a direct interest of 164,612,530 shares (50.65%) and no indirect interest
What major developments happened to Kee Ming recently?
On 1 September 2026, Kee Ming's subsidiary accepted two letters of award totalling RM40.0 million for M&E engineering subcontract works: RM21.0 million for a Penang warehouse (expected completion Q1 2027) and RM19.0 million for a Selangor warehouse (expected completion Q2 2027). On 27 August 2026, Kee Ming held its first AGM following its 12 February 2026 ACE Market listing.
Read the full answer
On 1 September 2026, Kee Ming Electrical Sdn. Bhd., the wholly-owned subsidiary of Kee Ming Group, accepted two letters of award totalling RM40.0 million for M&E engineering subcontract works[1]. The first letter of award was for RM21.0 million to provide ACMV, fire protection, electrical and extra-low-voltage services for a warehouse project at Valdor Industrial Area, Penang, with expected completion in the first quarter of 2027[1]. The second letter of award was for RM19.0 million to provide electrical, fire protection and ACMV services for a warehouse project at Taman Perdagangan Elmina, Selangor, with expected completion in the second quarter of 2027
What is Kee Ming's ESG and sustainability record?
For FYE 2026, Kee Ming consumed 52,428 kWh of electricity, 1,369 m³ of water, and recycled 103 kg of paper through a licensed provider. The company installed solar PV panels at its Ipoh head office, LED lighting and inverter air-conditioning systems at office premises, and achieved 95.0% local sourcing. Employee turnover was 18.9%, with 242 total training hours provided.
Read the full answer
For the financial year ended 31 March 2026, Kee Ming Group reported total electricity consumption of 52,428 kWh and total water consumption of 1,369 m³[1]. The company recycled a total of 103 kg of paper through an appointed licensed recycling service provider[1]. During the year, Kee Ming adopted the 3R principles (Reduce, Reuse, Recycle) to minimise waste generation, with designated recycling and general waste bins provided at all office premises to facilitate proper waste segregation[1]
What are the main risks facing Kee Ming?
Kee Ming Group identifies three main business risks: non-recurring project revenue (M&E projects awarded project-by-project with no assurance of continuous new projects of similar size); cost overruns and raw material price fluctuations (exposure to commodity price movements in copper, aluminium, electrical cables and steel); and dependency on subcontractors (exposure to non-performance, late or poor performance risks).
Read the full answer
Kee Ming Group identifies the non-recurring nature of project revenue and sustainability of financial performance as a key risk[1]. M&E engineering service projects in Malaysia are generally awarded on a project-by-project basis and are typically one-off in nature due to competitive tendering[1]. The company states there is no assurance it will be able to continuously secure new projects of similar size and scope from existing or potential customers in the future[1]
What does management say about Kee Ming's future outlook?
In the prospects note filed 25 May 2026, management states the M&E engineering services market outlook remains favourable, projected to grow at 11.9% CAGR from 2025 to 2029 to reach RM16.82 billion by 2029, underpinned by the 13th Malaysia Plan's RM430 billion development expenditure, Johor-Singapore Special Economic Zone, major public transportation projects and data centre investments. The Board remains optimistic for FY2027, with an order book of RM151.9 million as at 31 March 2026.
Read the full answer
In the quarterly prospects note filed 25 May 2026, management states the outlook for the M&E engineering services market in Malaysia remains favourable, underpinned by sustained government-led infrastructure spending, robust private sector investment, and continued expansion in the industrial and commercial property sectors[1]. The market has demonstrated strong structural growth, expanding from RM6.6 billion in 2022 to RM9.6 billion in 2024, and is projected to grow at a compound annual growth rate of 11.9% from 2025 to 2029, reaching RM16.82 billion by 2029[1]
Is Kee Ming's profit growing or declining, and why?
Kee Ming Group's profit is growing. Net profit for the quarter ended 30 June 2026 was RM6.4 million, up 6.1% from RM6.1 million in the prior quarter. For the six months ended 30 June 2026, net profit was RM12.5 million. Management attributes year-to-date revenue growth of 142.7% to higher project execution activities from M&E engineering services, particularly from industrial and commercial sectors.
Read the full answer
Kee Ming Group's profit is growing. For the quarter ended 30 June 2026, net profit was RM6.4 million, an increase of 6.1% from RM6.1 million in the immediately preceding quarter ended 31 March 2026[1]. Basic earnings per share for the quarter ended 30 June 2026 was 1.98 sen, compared to 2.07 sen in the prior quarter[1]. The lower EPS despite higher net profit reflects the increase in shares outstanding following the company's initial public offering on 12 February 2026.
For the six months ended 30 June 2026, cumulative net profit was RM12.5 million (calculated from the quarterly figures: RM6.1 million for the quarter ended 31 March 2026 plus RM6.4 million for the quarter ended 30 June 2026), with no comparative figures available for the year-earlier period as the company only began reporting quarterly results in compliance with listing requirements
More questions about Kee Ming
Why does Kee Ming Group show no year-over-year comparisons for quarterly revenue and profit in 2026?
Kee Ming Group's quarterly reports for the quarters ended 31 December 2025, 31 March 2026 and 30 June 2026 state "This is the first/second interim financial report being announced by the Group in compliance with the Listing Requirements. As such, there are no comparative figures for the preceding year's corresponding quarter"[1][2][3]. The company only began reporting quarterly results after its listing on the ACE Market on 12 February 2026, so no quarterly figures exist for the year-earlier periods.
Why did Kee Ming Group's effective tax rate exceed the statutory rate in the quarter ended 30 June 2026?
For the quarter ended 30 June 2026, Kee Ming Group's effective tax rate was 27.20%, higher than the statutory corporate tax rate of 24%[1]. The filing notes that the year-to-date effective tax rate of 27.20% exceeds the statutory rate due to the effect of non-deductible expenses, which include professional fees in relation to the company's initial public offering exercise[1].
What are the recurrent related party transactions Kee Ming Group seeks shareholder approval for?
Kee Ming Group seeks shareholder ratification for recurrent related party transactions (RRPTs) with Solarvest Group executed since listing: M&E engineering services of RM1,377,000 actual through the AGM date, and purchases of electrical consumables and equipment of RM4,169,000 actual[1][2]. The company also seeks a new shareholders' mandate for future RRPTs, with estimated values of up to RM250,000,000 for M&E engineering services and up to RM50,000,000 for electrical consumables and equipment post-AGM, determined at prevailing market rates using third-party price comparisons where practicable[1][2]. Interested parties holding 23.85% of shares will abstain from voting[1][2].
Why did Kee Ming Group's operating cash flow turn negative despite reporting a profit for the quarter ended 30 June 2026?
Operating cash flow for the financial year to date to 30 June 2026 was negative RM14.2 million, while the company reported a net profit of RM6.4 million for the quarter ended 30 June 2026[1]. Operating cash flow is cumulative for the financial year to date, not a single quarter, and includes working-capital movements that do not appear in profit, so the two should not be compared directly[1]. The filing does not provide a detailed cash flow statement for the single quarter or explain the specific working capital movements.
. Within M&E engineering services, projects from the industrial and commercial sectors collectively contributed 81.2% of total revenue in FYE 2025 and 81.0% in FYE 2026
The maintenance and repair services segment remained minimal at 0.1% of total revenue in both FYE 2025 and FYE 2026[1]. Following completion of some M&E engineering projects, the company is appointed to provide maintenance and repair services, and may also be appointed to provide such services on M&E equipment and systems not installed by Kee Ming[1]. Activities in this segment are generally derived from scheduled maintenance and repair orders upon customers' request[1].
For the financial year ended 31 March 2026, the company's total revenue was RM151.49 million, an increase of 142.7% from RM62.41 million in FYE 2025[1]. As at 31 March 2026, Kee Ming had 93 ongoing projects with a total project value of RM339.52 million and a total outstanding order book of RM151.87 million[1].
Within M&E engineering services, projects from the industrial and commercial sectors collectively contributed 81.2% of total revenue in FYE 2025 and 81.0% in FYE 2026[1]. For the year-to-date financial period ended 31 March 2026, industrial and commercial sectors contributed 81.1% of the total revenue from M&E engineering services[2].
The maintenance and repair services segment remained minimal, contributing 0.1% of total revenue in both FYE 2025 and FYE 2026[1]. The overall gross profit margin decreased slightly from 24.4% in FYE 2025 to 23.8% in FYE 2026, which management attributes to completion or near-completion of certain higher-margin projects and dilution from certain major ongoing projects with lower margins compared to the overall gross profit margin in the previous financial year[1].
. Basic earnings per share was 1.98 sen, compared to 2.07 sen in the prior quarter
Gross profit for the quarter was RM11.4 million, representing a gross margin of 23.6%, calculated from the reported figures[1]. Operating profit was RM9.0 million, representing an operating margin of 18.5%, calculated from the reported figures[1]. The pre-tax margin was 18.3% and the net margin was 13.3%, both calculated from the reported figures[1].
As at 30 June 2026, total assets stood at RM131.3 million and total equity at RM67.8 million[1]. Cash and deposits totalled RM42.6 million, while total borrowings (excluding lease liabilities) were RM13.0 million[1]. The current ratio was 2.05 times and the gross gearing ratio was 19.2%, both calculated from the reported figures[1]. Operating cash flow for the financial year to date was negative RM14.2 million, while capital expenditure was RM0.6 million[1]. The outstanding order book grew to RM206.4 million as at 30 June 2026, up from RM151.9 million at 31 March 2026[1].
Other significant holdings in the list of thirty largest shareholders include: Citigroup Nominees (Tempatan) Sdn Bhd with 5,340,700 shares (1.64%); CIMB Islamic Nominees (Tempatan) Sdn Bhd for Kenanga Islamic Balanced Fund with 4,198,200 shares (1.29%); Cartaban Nominees (Tempatan) Sdn Bhd for Kenanga Growth Fund Series 2 with 4,036,500 shares (1.24%); and Loke Hooi Kit with 3,969,100 shares (1.22%)[1]. The list of largest shareholders counts each securities account separately, so one investor can appear multiple times through different nominee accounts; the register of substantial shareholders adds up each holder's direct and indirect interest[1]. Holdings change after 1 July 2026.
On 27 August 2026, Kee Ming Group held its first Annual General Meeting since its listing on the ACE Market of Bursa Malaysia Securities Berhad on 12 February 2026[3]. On 30 July 2026, the company sought shareholder ratification of recurrent related party transactions with Solarvest Group executed since listing and approval of a new shareholders' mandate for future such transactions of a revenue or trading nature[4][5].
Other recent developments include acceptance of letters of award by Kee Ming Electrical on 4 November 2026, 9 June 2026 and 3 April 2026[6][7][8].
.
In energy management, the company installed light-emitting diode (LED) lighting across office premises to improve lighting efficiency and reduce overall energy consumption, and installed inverter air-conditioning systems at office premises to optimise energy usage during cooling operations[1]. Kee Ming also installed solar photovoltaic panels at its head office in Ipoh to complement existing energy sources with renewable energy, reflecting a long-term commitment to increasing use of cleaner energy alternatives[1]. The company encourages switching off office lighting and electrical appliances when not in use and promotes carpooling among employees to minimise carbon footprint from daily commuting[1].
In supply chain management, the company achieved 95.0% local sourcing for the financial year ended 31 March 2026[1]. Workforce diversity showed 80.9% male and 19.1% female employees, with 74.5% aged 20-39, 21.3% aged 40-59, and 4.2% over 60[1]. The board comprised 42.9% male and 57.1% female directors[1]. Employee turnover was 18.9%, with 80.9% permanent employees[1]. Total training hours provided were 242 hours[1]. The company reported zero workplace injuries, zero environmental fines or non-compliance cases, zero regulatory fines or penalties, and zero confirmed incidents of bribery or corruption in FYE 2026[1]. Community investment totalled RM103,988[1].
. Success in tenders may be affected by factors such as level of competition, track record compared to competitors, and pricing and tender strategy
. To address this risk, the company continues to leverage its SPKK G7 licence, established track record and customer relationships to participate in a wide range of tender opportunities, including higher-value projects and government-related infrastructure projects
The company identifies cost overruns and fluctuations in raw material prices as a risk, stating its cash flows and profitability are dependent on the accuracy of cost estimates and movements in prices of key raw materials such as electrical power cables, copper and aluminium tapes with accessories, and steel brackets, most of which are exposed to commodity price fluctuations[1]. To mitigate this risk, the company maintains close business relationships with key suppliers to obtain timely market information and competitive pricing arrangements, adopts a prudent procurement strategy through bulk sourcing of common raw materials upon project confirmations to benefit from bulk discounts and avoid overstocking, and uses its project team to facilitate cost forecasting and budgeting based on latest quotations, historical commodity price trends and buffers for contingencies[1].
Dependency on subcontractors is identified as a risk, as the company typically engages subcontractors for M&E engineering works to fill labour gaps and manage operational costs[1]. The filings state this exposes the group to risks of non-performance, late or poor performance by subcontractors, and potential inability to find suitable alternative subcontractors in a timely manner or at comparable prices, which could lead to cost overruns and potential liquidated ascertained damages claims if projects are not completed within the stipulated timeframe[1].
.
The 13th Malaysia Plan, covering the period from 2026 to 2030, underpins much of this growth momentum with a projected RM430 billion in development expenditure[1]. Management identifies key government-driven catalysts for M&E engineering demand including the establishment of the Johor-Singapore Special Economic Zone, which is expected to spur large-scale industrial, commercial and infrastructure development in Johor; major public transportation projects such as the Penang Light Rail Transit and the Johor-Singapore Rapid Transit System; continued government-led affordable housing programmes; and accelerating investment in data centres across Malaysia[1].
Management states the company is well-positioned to capitalise on the favourable market environment following the successful listing on the ACE Market on 12 February 2026[1]. The IPO strengthened the company's financial standing, enabling it to undertake projects of greater scale and value, with ongoing deployment of IPO proceeds towards team expansion and implementation of an enterprise resource planning system expected to enhance operational capacity, project management controls and overall execution efficiency[1]. As at 31 March 2026, the company's total outstanding order book stood at RM151.9 million, providing near-term revenue visibility as it enters financial year 2027[1]. The Board of Directors remains optimistic about the company's prospects for the financial year ended 31 March 2026[1].
In management's review of performance for the year-to-date financial period ended 31 March 2026, the company attributes revenue growth to higher project execution activities from M&E engineering services, particularly from customers in the industrial and commercial sectors, which contributed 81.1% of the total revenue from M&E engineering services for the year-to-date period[2]. The cumulative year-to-date revenue of RM151.49 million for the period ended 31 March 2026 represented an increase of RM89.08 million or 142.7% compared to RM62.41 million in the preceding year ended 31 March 2025[2]. However, the filing notes that gross profit margin contracted from 34.9% in the quarter ended 31 March 2026 to 23.6% in the quarter ended 30 June 2026, which management does not explain in the quarterly report for the period ended 30 June 2026[1].