Trade Wizard features powerful TradingView charts to bring you the latest Bursa Malaysia stock pricing and market data. Sharpen your analysis with the TradingView platform — track market trends, follow global benchmarks like dow jones futures, and use robust tools to interpret price movements — all in one place.
Net profit, last four quartersRM102.2 million-5.9% vs a year earlier2025-09-30 to 2026-06-30[1][2][3][4]
Dividends, last four quarters1.75 sen2025-09-30 to 2026-06-30[1][2][3][4]
What changed and why
Revenue fell 40.5% in Q2 2026
Revenue for the quarter ended 30 June 2026 was RM129.9 million, down 40.5% from RM218.5 million in the same quarter of 2025, though up 9.0% quarter-on-quarter[1]. The filing does not state the reason for the year-on-year decline.
Water production fell 4.1% in 2025
Average daily water production at SSP1 fell 4.1% in 2025 compared to 2024 due to Air Selangor's redistribution initiatives through supply optimisation and Non-Revenue Water reduction programmes, with some areas previously served by SSP1 now partially served by the Langat 2 Water Treatment Plant[1].
Toll revenue rose 51% in H1 2025
Toll highway revenue for the six months ended 30 June 2025 rose 51% year-on-year to RM117.5 million from RM77.9 million, driven by higher average daily traffic on both Grand Saga and Grand Sepadu highways due to heightened economic activities[1].
RTF construction cost revised to RM88m
The total estimated construction cost for the Residuals Treatment Facility at SSP1 was revised to approximately RM88 million from RM85 million previously disclosed; the facility is scheduled for commissioning by June 2026[1].
Taliworks operates infrastructure concessions in Malaysia: water treatment and supply (the SSP1 plant serving Selangor and Federal Territories), toll highways (Grand Saga and Grand Sepadu in Klang Valley), waste management, renewable energy (electricity generation), and construction (including a residuals treatment facility at SSP1).
Read the full answer
Taliworks Corporation Berhad operates infrastructure concessions in Malaysia across five main business segments[1]. The water treatment and supply segment runs the SSP1 water treatment plant, which serves Selangor and the Federal Territories under a Bulk Water Supply Agreement[2]. The toll highway segment manages two highways in Klang Valley: the Grand Saga highway and the Grand Sepadu Highway, the latter connecting developments in Klang, Bandar Bukit Raja, Bandar Sultan Sulaiman Industrial Zone, Northport and Westport[2]. The company also operates waste management services, renewable energy facilities (generating electricity), and construction activities (including the construction of a Residuals Treatment Facility at SSP1)[1][2]. The water and toll highway segments are the predominant contributors to the Group's profits and cash flows[1].
How does Taliworks make money?
Taliworks earns from five segments: water treatment (selling treated water), toll highways (toll collections), waste management (concession fees), renewable energy (electricity sales), and construction (contract works). For the six months ended 30 June 2025, toll contributed 36% of revenue, waste management 25%, water 20%, construction 12%, renewable energy 5%.
Read the full answer
For the six months ended 30 June 2025, Taliworks' revenue came from water treatment and supply (20% of total revenue), toll highway (36%), waste management (25%), renewable energy (5%), construction (12%), and others (2%)[1]. The water treatment segment earns from selling treated water under its Bulk Water Supply Agreement[2]. The toll highway segment collects tolls from road users on the Grand Saga and Grand Sepadu highways; Class 2 and 3 commercial vehicles, though smaller in number (18.4% of total vehicles), accounted for 47.0% of toll collections on Grand Sepadu due to higher toll rates[2]
Which business segments performed better or worse for Taliworks?
For the six months ended 30 June 2025, toll highway revenue rose 51% year-on-year to RM117.5 million on higher traffic from economic activity, while water treatment revenue fell 2% to RM66.2 million due to a 4.1% production decline. The filings state water and toll contribute the bulk of profits but do not disclose segment profit figures.
Partial answer: the filings do not cover every part of this question.
Read the full answer
For the six months ended 30 June 2025, the toll highway segment's revenue rose 51% year-on-year to RM117.5 million from RM77.9 million, driven by higher average daily traffic on both Grand Saga and Grand Sepadu highways due to heightened economic activities[1]. Water treatment and supply revenue declined 2% to RM66.2 million from RM67.8 million, reflecting a 4.1% reduction in average daily water production at SSP1 in 2025 compared to 2024; this was due to Air Selangor's redistribution initiatives through supply optimisation and Non-Revenue Water reduction programmes, with some areas previously served by SSP1 now partially served by the Langat 2 Water Treatment Plant[1]
What were Taliworks's latest quarterly results?
For the quarter ended 30 June 2026, Taliworks reported unaudited revenue of RM129.9 million (down 40.5% year-on-year, up 9.0% quarter-on-quarter), profit before tax of RM21.4 million, and net profit of RM14.1 million (down 53.1% year-on-year, up 30.9% quarter-on-quarter). Basic EPS was 0.57 sen; a second interim dividend of 0.25 sen per share was declared.
Read the full answer
For the quarter ended 30 June 2026, Taliworks reported unaudited revenue of RM129.9 million, down 40.5% from RM218.5 million in the same quarter of 2025 but up 9.0% from the preceding quarter[1]. Profit before tax was RM21.4 million[1]. Net profit after tax was RM14.1 million, down 53.1% from RM30.0 million a year earlier but up 30.9% quarter-on-quarter[1]
Who owns Taliworks?
As at 25 March 2026, LGB Group Sdn Bhd held 49.95%, Lembaga Tabung Haji 7.29%, and DBS Bank Ltd (for Vijay Vijendra Sethu) 4.03%. The Employees Provident Fund held 2.57% directly plus 1.33% in its Islamic account. Individual shareholders Lim Chee Meng and Ng Yim Hoo held 2.12% and 0.9% respectively.
Read the full answer
As at 25 March 2026, LGB Group Sdn Bhd was the largest shareholder with 1,006,833,333 shares (49.95%)[1]. Lembaga Tabung Haji held 146,950,000 shares (7.29%), plus an additional 6,290,033 shares (0.31%) held through its Principal account[1]. The third-largest holding was 81,250,000 shares (4.03%) held by DBS Bank Ltd for Vijay Vijendra Sethu[1]. Citigroup Nominees held 75,000,000 shares (3.72%) and 42,669,583 shares (2.12%) in two separate accounts
What major developments happened to Taliworks recently?
Taliworks declared four interim dividends between August 2025 and August 2026: 0.5 sen, 0.75 sen, 0.25 sen, and 0.25 sen per share. The company released Q2 FYE2026 results in August 2026 and filed its Annual Report for FYE2025 in April 2026, proposing renewal of its recurrent related party transactions mandate.
Read the full answer
Between August 2025 and August 2026, Taliworks declared four interim dividends totalling 1.75 sen per share: 0.5 sen for the quarter ended 30 September 2025 (declared 19 November 2025), 0.75 sen for the quarter ended 31 December 2025 (declared 11 February 2026), 0.25 sen for the quarter ended 31 March 2026 (declared 22 May 2026), and 0.25 sen for the quarter ended 30 June 2026 (declared 20 August 2026)[1][2][3]
What is Taliworks's ESG and sustainability record?
Taliworks issued an errata in April 2025 reformatting the Performance Data Table in its 2023 Sustainability Statement to comply with Bursa Malaysia's format without changing data. The company outlined divisional sustainability goals including dewatering plant project execution (water), toll rate restructuring (toll), tariff negotiation (waste management), panel replacement (renewable energy), and ISO accreditations.
Partial answer: the filings do not cover every part of this question.
Read the full answer
On 29 April 2025, Taliworks issued an errata notice regarding its 2023 Sustainability Statement (originally issued 29 April 2024), reformatting pages 148–151 of the Performance Data Table to comply with Bursa Malaysia Securities Berhad's prescribed format; the underlying data remained unchanged[1]. The company outlined divisional sustainability and operational goals: the Water Treatment division aims for efficient execution of the dewatering plant project under the Bulk Water Supply Agreement[1]
What are the main risks facing Taliworks?
Management identifies reduced water production at SSP1 due to Air Selangor's supply redistribution as a risk to profitability, mitigated by energy-saving measures. For toll, climate-related deterioration and flooding risks are addressed through pavement rehabilitation and a retention pond project. Waste management tariff negotiations have been deferred since 2018.
Read the full answer
Management identifies the 4.1% reduction in average daily water production at SSP1 in 2025 (compared to 2024) as a risk to profitability, caused by Air Selangor's redistribution of supply to areas now partially served by the Langat 2 Water Treatment Plant under supply optimisation and Non-Revenue Water reduction programmes[1]. To mitigate potential reduced profitability, SSP1 will continue implementing energy-saving measures and proactive maintenance scheduling to ensure operational efficiency and sustainable operating costs[1]. Production is expected to see a slight recovery once the new Bukit Mayong Pumping Station (150 MLD capacity) becomes operational, currently targeted by end-2025
What does management say about Taliworks's future outlook?
Management states profitability is driven by water and toll segments. The water sector is expected to experience stable but moderate growth in 2025, with SSP1 production expected to recover slightly once the Bukit Mayong Pumping Station becomes operational by end-2025. The toll segment's prospect remains positive, driven by heightened economic activities.
Read the full answer
In its prospects note filed 27 August 2025, management states that the Group's profitability is predominantly driven by the water treatment and supply and toll highway segments, as they contribute the bulk of profits and cash flows[1]. For 2025, the water services sector in Selangor and Federal Territories is expected to experience stable but moderate growth, with demand remaining relatively steady supported by gradual population and commercial growth[1]. Production from SSP1 is expected to see a slight recovery once the new Bukit Mayong Pumping Station (150 MLD capacity) becomes operational, currently targeted by the end of 2025, designed to address increased demand in northern regions and specific zones in Klang and Kuala Selangor
Is Taliworks's profit growing or declining, and why?
Net profit declined 5.9% over the trailing four quarters ended 30 June 2026 (RM102.2 million) versus the prior four quarters (RM108.6 million). The June 2026 quarter's RM14.1 million was down 53.1% year-on-year but up 30.9% quarter-on-quarter. Management attributes lower water revenue to Air Selangor's supply redistribution, partially offset by higher toll revenue.
Read the full answer
For the trailing four quarters ended 30 June 2026, Taliworks' net profit was RM102.2 million, down 5.9% from RM108.6 million in the prior four quarters[1]. The quarterly trend shows significant volatility: the September 2025 quarter recorded net profit of RM48.0 million (up 0.8% year-on-year), December 2025 RM29.4 million (up 62.7%), March 2026 RM10.8 million (down 16.6%), and June 2026 RM14.1 million (down 53.1% year-on-year but up 30.9% quarter-on-quarter)[1][2]
More questions about Taliworks
Why does Taliworks report both consolidated and proportionate segment figures?
The segment note states that revenue and profit performance represent the Group's proportionate share of interest in each subsidiary (instead of full consolidation) and include a proportionate share of joint ventures or associates (instead of equity accounting), which is then reconciled to the consolidated income statement[1]. This is the measure reported to chief operating decision makers for resource allocation and performance assessment[1]. The consolidated quarterly results show the full statutory figures required under accounting standards.
What is the Bukit Mayong Pumping Station project and when will it be completed?
Air Selangor is advancing construction of a new pumping system for the Bukit Mayong Reservoir at SSP1, with a capacity of 150 million litres per day to accommodate future demand[1]. The project is currently scheduled for completion by the fourth quarter of 2025 and is designed to effectively address increased demand for treated water in the northern regions, as well as specific zones in Klang and Kuala Selangor[1]. Management expects production from SSP1 to see a slight recovery once the station becomes operational[1].
Why has the waste management tariff increase been deferred since September 2018?
The filings state that the waste management division's goal is to finalise the second cycle tariff increase negotiation, which has been deferred since September 2018[1]. However, the filings do not disclose the reasons for the deferral or the status of negotiations with the relevant authorities.
. The construction segment recognises revenue from contract works, including the Rasau Project and the construction of the Residuals Treatment Facility
, but do not disclose segment profit figures. Construction revenue rose 7% to RM39.4 million, while renewable energy revenue increased to RM15.8 million
. The Employees Provident Fund Board held 51,837,481 shares (2.57%) directly, plus 26,824,719 shares (1.33%) in its Islamic account and 3,729,800 shares (0.19%) in its CPIAM EQ account
. Individual shareholders included Lim Chee Meng with 42,645,050 shares (2.12%) directly plus 41,666,666 shares (2.07%) through CIMB nominees, and Ng Yim Hoo with 18,063,333 shares (0.9%)
. On 24 March 2026, the company proposed renewal of its existing shareholders' mandate for recurrent related party transactions of a revenue or trading nature, with a circular to shareholders issued on 29 April 2026 and a general meeting notice on 28 April 2026
. For the toll highway segment, the company recognises climate-related risk, particularly long-term deterioration of highway infrastructure, and addresses this through pavement rehabilitation works based on assessment reports, at a cost of RM3.60 million in FY2025
. Occasional flooding along the highway is managed through collaboration with authorities on a long-term mitigation solution, including a proposed retention pond at the Meru Interchange to be financed by Jabatan Pengairan dan Saliran Negeri Selangor
. The Residuals Treatment Facility is scheduled for commissioning by June 2026, with total estimated construction cost revised to approximately RM88 million from RM85 million previously, funded primarily by bank borrowings
. The toll highway segment's prospect remains positive, driven by heightened economic activities; both Grand Saga and Grand Sepadu highways experienced higher average daily traffic in 2024 and the current period
. The company's review of performance for the six months ended 30 June 2025 explains that water treatment revenue declined 2% year-on-year due to a 4.1% reduction in average daily production at SSP1, caused by Air Selangor's redistribution initiatives and supply optimisation, with some areas now served by the Langat 2 Water Treatment Plant